Navigation Menu
Chimborazo
Chimborazo Summit Log (#830)
- Signed By: Brian of Los Angeles, CA, USA
- Date Submitted: September 08, 2003
Left the upper hut at 12:30 am. via the normal route, steady climbing until about 6000 meters. We post holed and slipped for the next 2 1/2 hours. That was miserable. We summited at 8:15am.
We had no views, summit was covered by thick fog. Great climb though.
About Peakware Contact Us Sponsorship Privacy Disclaimer
Copyright © 1998-2013 Interactive Outdoors, Inc. All rights reserved.
