Chimborazo

Chimborazo Summit Log (#830)

  • Signed By: Brian of Los Angeles, CA, USA
  • Date Submitted: September 08, 2003

Left the upper hut at 12:30 am. via the normal route, steady climbing until about 6000 meters. We post holed and slipped for the next 2 1/2 hours. That was miserable. We summited at 8:15am.

We had no views, summit was covered by thick fog. Great climb though.

Chimborazo Log Index

About Peakware Contact Us Sponsorship Privacy Disclaimer